78
H) Assemble the control panel after inserting the probes and the microswitch cable into the hole on the mantle cover. Remove the control panel
cover and reassemble the cover after fixing the panel to the cover.
I) Apply the fiber glass insulation, supplied to protect the cables, on the boiler body. Then, insert the probes into the sleeve on the rear head
and connect the micro-switch cable. To protect the micro-switch cable, always verify that is it positioned inside the bend on the side of the
mantle. Close the mantle cover.
L) Connect the power supply line and plant pump before assembling the cable straps.
Fig. 13.16: Insertion of the probes into the sheath
Fig. 13.17: Microswitch wiring
Fig. 13.13: Hole on cover
Fig. 13.15: Control panel cover
Fig. 13.14: Fixing of control panel
Fig. 13.18: Power supply
Fig. 13.19: Cable straps