Sime Rondo B Series Manual Download Page 33

2.1 

BOILER ROOM

The boiler room should feature all the
characteristics  required  by  standards
governing liquid fuel heating systems.

2.2

BOILER ROOM DIMENSIONS

Position the boiler body on the founda-
tion  bed,  which  should  be  at  least  10
cm high. 
The  body  should  rest  on  a  surface
allowing  shifting,  possibly  by  means  of
sheet metal. 
Leave  a  clearance  between  the  boiler
and  the  wall  of  at  least  0.60  m,  and
between the top of the casing and the
ceiling  of  1  m  (0.50  m  in  the  case  of
boilers with incorporated D.H.W. tank). 
The  ceiling  height  of  the  boiler  room
should be less than 2.5 m.

2.3

CONNECTING UP SYSTEM

When connecting up the water supply
to the boiler, make sure that the speci-
fications given in fig. 1 are observed. 
All connecting unions should be easy to
disconnect  by  means  of  tightening
rings. A closed expansion tank system
must be used.

2.3.1  Accessories

(fig. 2)

To ensure boiler efficiency, fit an auto-
matic  air  bleed  valve  (3)  to  the  3/8”
sleeve of the heat delivery tube, and a
pressure relief valve set to 3 bar (12)
to the 1/2” sleeve. 
Install a pressure relief valve calibrated
to 6 bar (8) on the boiler water infeed
pipe to prevent the risk of bursting due
to excess pressure build up. 
If  the  boiler  safety  valve  cuts  in  fre-
quently,  install  a  5-litre  expansion  ves-
sel  (7)  with  maximum  operating  pres-
sure of 8 bar on the hot water circuit.
The tank should be fitted with a natural
rubber food-grade diaphragm. 
The  central  heating  circuit  pump  can
be installed at the rear of the boiler in
place of the connection union (4).

2.3.2 Filling the water system

Before  connecting  the  boiler,  thor-
oughly flush the system to eliminate
scale which could damage the appli-
ance.

Filling  must  be  done  slowly  so  as  to
allow  any  air  bubbles  to  be  bled  off

through the air valves. 
In  closed-circuit  heating  systems,  the
cold water filling pressure and the pre-
charging  pressure  of  the  expansion
vessel should be no less than or equal
to the height of the water head of the
installation  (e.g.  for  water  head  of  5
meters,  the  vessel  pre-charging  pres-
sure  and  installation  filling  pressure
should be at least 0.5 bar).

2.3.3 D.H.W. production

During  the  preparation  of  hot  water,
the  circulating  pump  installed  on  the
boiler circuit remains in operation until
the  boiler  thermostat  probe  detects
the pre-selected value. 
Once the boiler thermostat has reach
the  set  point,  and  the  selector  has
been  set  to  winter  operation  with  the
room thermostat on demand, the cen-
tral heating circuit pump (not supplied)
can be actuated. 

All residual air in the boiler coils must
be bled at the first start-up to ensure
proper operation. 
To  facilitate  this  operation,  position
the  slot  of  the  release  screw  on  the
check  valve  horizontally  (6  fig.  2).
Once  the  air  has  been  bled,  return
the screw to its original position. 

This domestic hot water boiler is of the
rapid  accumulation  type,  made  from
vitreous  enamelled  steel  with  foam
polyurethane lining, and has a capacity
of 80 litres. 
The  high  degree  of  thermal  insulation
drastically  reduces  heat  dispersal,
thereby  cutting  boiler  maintenance
costs. 

2.3.4 Characteristics 

of feedwater

To  prevent  lime  scale  and  damage  to
the  tap  water  exchanger,  the  water
supplied should have a hardness of no
more than 20°F. 
In  all  cases  the  water  used  should  be
tested  and  adequate  treatment  devi-
ces  should  be  installed.  To  prevent
lime  scale  or  deposits  on  the  primary
exchanger,  the  water  used  to  supply
the  heating  circuit  should  must  be
treated  in  accordance  with  UNI-CTI
8065 standards.
The water used for the central heating
system  should  be  treated  in  the  fol-
lowing cases:
– For  extensive  systems  (with  high

contents of water).

– Frequent  addition  of  water  into  the

system.

– Should it be necessary to empty the

system either partially or totally.

2.4

CONNECTING UP FLUE

The flue is of fundamental importance
for the proper operation of the boiler; if
not  installed  in  compliance  with  the
standards,  starting  the  boiler  will  be
difficult and there will be a consequent
formation  of  soot,  condensate  and
encrustation.
The  flue  used  to  expel  combustion
products  into  the  atmosphere  must
meet the following requirements:
– be  constructed  with  waterproof

materials,  and  resistant  to  smoke
temperature and condensate;

– be of adequate mechanical resilience

and of low heat conductivity;

– be  perfectly  sealed  to  prevent  cool-

ing of the flue itself;

– be as vertical as possible; the termi-

nal section of the flue must be fitted
with  a  static  exhaust  device  that
ensures  constant  and  efficient
extraction of products generated by
combustion;

– to  prevent  the  wind  from  creating

pressure  zones  around  the  chim-
ney  top  greater  than  the  uplift
force  of  combustion  gases,  the
exhaust  outlet  should  be  at  least
0.4 m higher than structures adja-
cent  to  the  stack    (including  the
roof top) within 8 m;

– have  a  diameter  that  is  not  inferior

to that of the boiler union: square or
rectangular-section  flues  should
have  an  internal  section  10%
greater than that of the boiler union;

– the  useful  section  of  the  flue  must

conform to the following formula:

S

resulting section in cm

2

K

reduction  coefficient  for  liquid
fuels:
– 0.045 for firewood
– 0.030 for coal
– 0.024 for light oil
– 0.016 for gas

P

boiler input in kcal/h

H height  of  flue  in  meters,  mea-

sured from the flame axis to the
top of the flue reduced by:
– 0.50  m  for  each  change  of

direction  of  the  connection
union between boiler and flue;

– 1.00  m  for  each  metre  of

union itself.

31

2

INSTALLATION

P

S

= K

H

Summary of Contents for Rondo B Series

Page 1: ...IT ES PT GB FR BE Rond B CERTIFICAZIONE DEL SISTEMA DI QUALITA AZIENDALE...

Page 2: ...E 3 1 CONTROLLI PRELIMINARI ALL ACCENSIONE 6 3 2 ACCENSIONE E FUNZIONAMENTO 3 3 PULIZIA STAGIONALE 3 4 PROTEZIONE ANTIGELO 7 3 5 AVVERTENZE PER L UTENTE GARANZIA CONVENZIONALE 8 ELENCO CENTRI ASSISTEN...

Page 3: ...31 3 40 0 27 6 32 7 kcal h 26 900 34 400 23 700 28 100 Portata termica kW 34 8 44 3 30 7 36 3 kcal h 29 900 38 100 26 400 31 200 Elementi n 4 5 4 5 Potenza elettrica assorbita W 80 80 80 80 Pressione...

Page 4: ...nodo di magnesio 10 Rubinetto scarico bollitore 11 Rubinetto scarico caldaia non di fornitura 12 Valvola sicurezza caldaia non di fornitura 13 Bruciatore non di fornitura 14 Bollitore 1 4 SCHEMA FUNZI...

Page 5: ...golati in modo tale che il valore della CO2 sia quello indicato al punto 1 3 con tolleranze 5 3 R 75 110 M8 Fig 3 a 0 120 1500 1000 500 Portata acqua l h Perdite di carico mbar 100 80 20 40 60 2000 Ro...

Page 6: ...a sani taria il circolatore del circuito sanita rio rimarr in funzione fino a quando la sonda del termostato bollitore avr raggiunto il valore selezionato sulla manopola Soddisfatto il termostato boll...

Page 7: ...tazione e dovr essere ali mentata con tensione monofase 230V 50Hz attraverso un interrutto re generale protetto da fusibili Il cavo del regolatore climatico la cui installazione d obbligo per ottenere...

Page 8: ...i regolare la manopola del termosta to caldaia 8 ad una temperatura non inferiore a 60 C Il valore della temperatura impostata si controlla sul termometro 5 3 2 2 Termostato sicurezza fig 6 Il termost...

Page 9: ...ed il funzionamento dell apparecchiatura Difficolt di regolazione del bruciato re e o mancanza di rendimento Controllare il regolare afflusso di combustibile la pulizia del genera tore il non intasame...

Page 10: ...re la propria copia da esibire al Centro Assistenza Autorizzato in caso di necessit oppure nel caso non sia stata effettuata la verifica iniziale dovr esi bire la documentazione fiscale rilasciata all...

Page 11: ...erate Ass Termica 039 9906538 LODI Termoservice 0371 610465 MANTOVA Mantova Ravanini Marco 0376 390547 Asola Facchinetti e Carrara 0376 710345 Castigl Stiviere Andreasi Bassi Guido 0376 672554 Castigl...

Page 12: ...Tecnoca 0735 581746 MACERATA Morrovalle Scalo Cast 0733 865271 S Severino M Tecno Termo Service 0733 637098 PESARO URBINO Pesaro Paladini Claudio 0721 405055 Cagli S T A C Sadori 0721 787060 Lucrezia...

Page 13: ...ICA 16 3 USO Y MANTENIMIENTO 3 1 CONTROLES PREVIOS A LA PUESTA EN MARCHA 17 3 2 ENCENDIDO Y FUNCIONAMIENTO 3 3 LIMPIEZA Y MANTENIMIENTO 3 4 ANODO DE MAGNESIO 18 3 6 ADVERTENCIAS PARA EL USUARIO ESPA O...

Page 14: ...3 40 0 27 6 32 7 kcal h 26 900 34 400 23 700 28 100 Caudal t rmico kW 34 8 44 3 30 7 36 3 kcal h 29 900 38 100 26 400 31 200 Elementos n 4 5 4 5 Potencia el ctrica absorbida W 80 80 80 80 Presi n m xi...

Page 15: ...acumulador 11 Llave de vaciado caldera no suministrado 12 V lvula de seguridad caldera no suministrado 13 Quemador no suministrado 14 Acumulador 1 4 ESQUEMA DE FUNCIONAMIENTO Fig 2 L Volumen mm dm3 R...

Page 16: ...el valor de la CO2 sea el indicado en el punto 1 3 con una tole rancia de 5 14 R 75 110 M8 Fig 3 a 0 120 1500 1000 500 Portata acqua l h Perdite di carico mbar 100 80 20 40 60 2000 Rond B4 Rond B 140...

Page 17: ...o acumulador haya alcanzado el valor programado a trav s de su manopla Satisfecho el termostato acumulador si el desviador est puesto en invierno y el termostato ambiente est en demanda puede arrancar...

Page 18: ...n un cable el ctrico de alimentaci n y debe ser ali mentada con corriente monof sica 230V 50HZ a trav s de un interrup tor general protegido por fusibles El termostato ambiente es necesario para obten...

Page 19: ...se aconseja de regular la manopla del termostato caldera 8 a una tempe ratura de m nimo 60 C El valor de la temperatura establecida se controla sobre el term metro 5 3 2 2 Termostato de seguridad fig...

Page 20: ...llama Dificultad de regulaci n del quema dor y o falta de rendimiento Controle el buen flujo de combusti ble la limpieza del generador la no obstrucci n del conducto de evacua ci n de humos la real po...

Page 21: ...AMIN 2 5 INSTALA O EL CTRICA 24 3 USO E MANUTEN O 3 1 INSPEC O PRELIMINAR ANTES DO ACENDIMENTO 25 3 2 ACENDIMENTO E FUNCIONAMENTO 3 3 LIMPEZA PERI DICA 3 4 PROTEC O ANTI CONGELAMENTO 26 3 6 ADVERT NCI...

Page 22: ...a kW 31 3 40 0 27 6 32 7 kcal h 26 900 34 400 23 700 28 100 Caudal t rmico kW 34 8 44 3 30 7 36 3 kcal h 29 900 38 100 26 400 31 200 Elementos n 4 5 4 5 Pot ncia el ctrica absorvida W 80 80 80 80 Pres...

Page 23: ...magn sio 10 Torneira de descarga do acumulador 11 Torneira de descarga da caldeira n o fornecida 12 V lvula de seguran a da caldeira n o fornecida 13 Queimador n o fornecido 14 Acumulador 1 4 ESQUEMA...

Page 24: ...do tal que o valor de CO2 seja o indicado na al nea 1 3 com uma toler ncia de 5 22 R 75 110 M8 Fig 3 a 0 120 1500 1000 500 Portata acqua l h Perdite di carico mbar 100 80 20 40 60 2000 Rond B4 Rond B...

Page 25: ...tenha alcan ado o valor seleccionado no bot o Activado o term stato do acumulador se o desviador estiver na posi o de Inverno e o term stato de ambiente estiver em chamada pode arrancar a bomba de aq...

Page 26: ...ptor geral protegido por fus vel O cabo do term stato de ambiente cuja instala o aconselh vel para obter um melhor controlo da temperatura ambiente dever ser ligado como mostra a figura 5 Ligar ent o...

Page 27: ...peratura progra mada controlado no term metro 5 3 2 2 Term stato de seguran a fig 6 O term stato de seguran a de rearme manual 3 interv m causando a inter rup o de funcionamento do queima dor quando a...

Page 28: ...do aparelho Dificuldade de regula o do queima dor e ou falta de rendimento Verificar O regular fluxo de combu st vel a limpeza da caldeira a n o obstru o da conduta de descarga dos fumos a real pot n...

Page 29: ...2 5 ELECTRICAL CONNECTION 3 USE AND MAINTENANCE 3 1 COMMISSIONING THE BOILER 33 3 2 LIGHTING AND OPERATION 3 3 REGULAR CLEANING 3 4 MAGNESIUM ANODE 34 3 6 USER WARNINGS ENGLISH FONDERIE SIME S p A of...

Page 30: ...utput kW 31 3 40 0 27 6 32 7 kcal h 26 900 34 400 23 700 28 100 Input kW 34 8 44 3 30 7 36 3 kcal h 29 900 38 100 26 400 31 200 Sections n 4 5 4 5 Adsorbed power consumption W 80 80 80 80 Maximum wate...

Page 31: ...9 Magnesium anode 10 D H W drain cock 11 Boiler drain cock not supplied 12 C H safety valve not supplied 13 Burner not supplied 14 D H W tank 1 4 FUNCTIONAL DIAGRAM Fig 2 L Volumen mm dm3 Rond B4 405...

Page 32: ...the CO2 value is that indicated in point 1 3 with a tolerance of 5 30 R 75 110 M8 Fig 3 a 0 120 1500 1000 500 Portata acqua l h Perdite di carico mbar 100 80 20 40 60 2000 Rond B4 Rond B 140 160 180...

Page 33: ...acilitate this operation position the slot of the release screw on the check valve horizontally 6 fig 2 Once the air has been bled return the screw to its original position This domestic hot water boi...

Page 34: ...t be connected to an efficient earthing system SIME declines all responsibility for injury caused to persons due to fai lure to earth the boiler Always turn off the power supply before doing any work...

Page 35: ...erature exceeds 95 C To restart the boiler unscrew the black cover and press the button underneath If the problem occurs fre quently call an authorised technical assistance centre for the necessary ch...

Page 36: ...of yield Check the regular flow of fuel the cleanness of the boiler the non obstruction of the smoke duct the real input supplied by the burner and its cleanness dust The boiler gets dirty easily Chec...

Page 37: ...ANCHEMENT ELECTRIQUE 40 3 MODE D EMPLOI ET ENTRETIEN 3 1 CONTROLES AVANT LA MISE EN MARCHE 41 3 2 MISE EN MARCHE ET FONCTIONNEMENT 3 3 NETTOYAGE SAISONNIER 3 4 PROTECTION ANTI GEL 42 3 5 MISE EN GARDE...

Page 38: ...sance utile kW 31 3 40 0 27 6 32 7 kcal h 26 900 34 400 23 700 28 100 D bit calorifique kW 34 8 44 3 30 7 36 3 kcal h 29 900 38 100 26 400 31 200 El ments n 4 5 4 5 Puissance lectrique absorb e W 80 8...

Page 39: ...Robinet de vidange ballon 11 Robinet de vidange chaudi re non fourni 12 Soupape de s curit non fournie 13 Br leur non fourni 12 Ballon 1 4 CIRCUIT HYDRAULIQUE Fig 2 L Volume mm dm3 Rond B4 405 24 0 R...

Page 40: ...valeur du CO2 cor responde celle indiqu e au point 1 3 avec une tol rance de 5 R 75 110 M8 Fig 3 a 0 120 1500 1000 500 Portata acqua l h Perdite di carico mbar 100 80 20 40 60 2000 Rond B4 Rond B 140...

Page 41: ...aquastat ballon Une fois la pompe ballon arr t e et condition que l in terrupteur ETE HIVER soit en position HIVER et que le thermostat d ambian ce soit en demande la pompe de l ins tallation non com...

Page 42: ...ur g n ral prot g par des fusibles Le thermostat d ambian ce n cessaire pour obtenir une meilleure r gulation de la temp ratu re devra tre reli comme indiqu sur les sch mas fig 5 Raccorder ensuite le...

Page 43: ...contr ler la valeur de temp ra ture programm e consulter le ther mom tre 5 3 2 2 Aquastat de s curit fig 6 L aquastat de s curit r armement manuel 3 se d clenche automatique ment provocant ainsi l ex...

Page 44: ...flamme le tarage de l air et le fonctionne ment de l appareillage R glage difficile du br leur et ou absence de rendement Contr ler le flux r gulier de combus tible la propret du g n rateur la propret...

Page 45: ...BRUIKSAANWIJZING EN ONDERHOUD 3 1 NA TE KIJKEN PUNTEN ALVORENS MEN DE KETEL IN WERKING STELT 48 3 2 INBEDRIJFSTELLING EN WERKING 3 3 SEIZOENREINIGING 49 3 4 VORSTBEVEILIGING 50 3 5 BELANGRIJKE AANWIJZ...

Page 46: ...ermisch vermogen kW 31 3 40 0 27 6 32 7 kcal h 26 900 34 400 23 700 28 100 Thermische doorstroomhoeveelheid kW 34 8 44 3 30 7 36 3 kcal h 29 900 38 100 26 400 31 200 Elementen n 4 5 4 5 Opgenomen elek...

Page 47: ...rd 9 Magnesiumanode 10 Afvoerkraan boiler 11 Afvoerkraan ketel niet meegeleverd 12 Veiligheidsklep ketel niet meegeleverd 13 Brander niet meegeleverd 14 Boiler 1 4 HYDRAULISCH CIRCUIT Fig 2 L Volume m...

Page 48: ...anderen is het noodzakelijk op de bus van 3 8 van de vertrek C V een automatische ontluchtingsklep 3 te plaatsen en op de bus van 1 2 een voor 3 bar geijkte veiligheidsklep 12 Daarnaast dient een voor...

Page 49: ...aties grote waterin houd Frequente watertoevoer integratie van installaties Als de installatie geheel of gedeelte lijk moet worden geleegd 2 4 AANSLUITING SCHOUW De schouw is heel belangrijk voor een...

Page 50: ...n de boiler 7 op de gewenste temperatuur De laad pomp blijft net zo lang draaien totdat het warme water de gewenste tem peratuur heeft bereikt Tijdens de productie van warm water wordt de temperatuur...

Page 51: ...ZOENREINIGING Het onderhoud aan de generator moet n keer per jaar uitgevoerd worden waarbij een beroep gedaan moet worden op de erkende techni sche dienst Alvorens met de reinigings of onderhoudswerkz...

Page 52: ...mogen en of de brander schoon is stof De ketel wordt gauw vuil Controleer de afstelling van de bran der analyse van de rookgassen de kwaliteit van de brandstof de mate van verstopping van de schoorste...

Page 53: ...ani di sicurezza e di controllo previsti dalle norme vigenti in mate ria e rispondono per caratteristiche tecniche e funzionali alle prescrizioni delle norme UNI 7936 dicembre 1979 FA130 84 FA168 87 E...

Page 54: ......

Page 55: ......

Page 56: ...Cod 6081120 Documentation Dpt Fonderie Sime S p A Via Garbo 27 37045 Legnago Vr Tel 39 0442 631111 Fax 39 0442 631292 www sime it...

Reviews: