Commissioning Checklist for Boilers in Cascade
This checklist is for guidence only, and is
not a full installaon
safety chec
k
A
dd
ress
Engineer
12345678
Sasfactory
visual check of flue Y/N
Flue within allowable
length and correctly terminated Y/N
Confirm
Tightness of installaon
pipework
downstream of Isolang
valve
using leak detecon
fluid
Y/N
Check ghtness
of all valves Y/N
Carryout ignion
test
of
boiler with gas isolated to ensure boiler fails safe Y/N
Turn on gas supply to
boiler and isolate main burner(disconnect gas valve)
and ensure boiler goes to lockout Y/N
Reset boiler lockout and retry, ensuring boiler again locks out Y/N
Reconnect gas valve, reset boiler lockout, and ensure boiler lights and is stable Y/N
Test
safety devices Y/N
Saety
stat(TS) - Disconnect - the boiler locks out Y/N
Flue analysis
Boiler 1
B
oiler 2
B
oiler 3
B
oiler 4
B
oiler 5
B
oiler 6
B
oiler 7
B
oiler 8
Boiler Output
Min
Max
Min
M
ax
Min
M
ax
Min
M
ax
Min
Max
Min
M
ax
Min
M
ax
Min
M
ax
CO ppm
CO2 %
Rao
Boiler size
Serial Number
Completed By
Date