13
IQ Power HL Power Supply
5201258 Rev. C
to PS COMM 1
Connection
Comm / Data Cable Construction
1 Crossover Wired
Reference color black
DO NOT USE standard Ethernet cables
Ground
Lead
Comm / Power (black)
1
IQ Power
HL Power Supply
to
HV1 or HV2
IQ Power HL Static Bar
Conduit and
Conduit Seals
see Control Drawing
5150003
Ground Jumper
Machine Frame Ground
Grounding Clamp
to CS 1 thru 10
POWER & COMM
to IQ Power device
IQ Power Control Station
to IQ Easy device
Figure 7. IQ Power Connections (HL Power Supply and Control Station)
H.
Connect Sensor
(if used). An IQ Power HL Sensor may be integrated into the
IQ Power system to provide feedback on static eliminating performance and is
used for the CLFB (Closed-Loop Feedback) static eliminating mode.
Use the 2.13 meter [7 foot] (black) modular cable supplied with Sensor
Interface. Longer cables (not supplied) are available. Cables for Sensor
Interface must be IQ Power 8-conductor modular cables with RJ-48 connectors
wired “crossover” (reference color: black, Figure 5).
The modular cable plugs into one of the connectors labeled “SI COMM 1” on
Sensor Interface and into the “PS COMM 2” connector on HL power supply,
see Figure 8.
The modular cable should not be run parallel with static bar high voltage
cable. Route modular cable clear of moving machine parts and protect it from
abrasion. Secure using nylon wire ties (not supplied). Do not over-tighten wire
tie.