![Simco-Ion IQ Power HL Installation And Operating Instructions Manual Download Page 22](http://html1.mh-extra.com/html/simco-ion/iq-power-hl/iq-power-hl_installation-and-operating-instructions-manual_1274778022.webp)
20
IQ Power HL Power Supply
5201258 Rev. C
System Start-up
A. Apply line voltage to AC adapter.
B. Move power supply “Power” switch to “On” (1) position.
C. The power supply indicators will briefly self-test during which all will light.
D. Power supply indicators will settle to display the system status.
On new systems the output indicator will settle to display low output, initial
calibration must be performed.
NOTE
– Calibration should be performed when the system is first installed
and may be performed after the static bar has been cleaned and the system
verified as operating correctly.
E. If the system is new, perform an initial calibration. The initial calibration sets
relative nominal ion output for the system. The calibration should only be
performed on IQ Power systems that are new or just cleaned and known to be
in proper working order.
During calibration the target to be neutralized (web, film, etc.) may remain in
place, but MUST NOT BE MOVING. If the web is moving past the static bar
(e.g. the machine is in operation) the calibration may be faulty.
Without Control Station
The system should be “on” and in the operating mode (the Calibration Locked
indicator should not be lit). Press the face label on power supply firmly on the word
“Calibrate”. This will initiate the calibration sequence and set relative nominal ion
output for the system.
With Control Station
The system should be “on”, in the operating mode and connected to the Control
Station (the Calibration Locked indicator will be lit). From the Home page, tap
on the device icon. Tap on the Neutralizer tab. Tap on the right arrow to get to
page 2. Locate and tap the editing pencil icon for Device Calibration. You will be
prompted to enter the Control Station password (default password is “password”).
Tap on “Yes” for Calibrate Device? At the completion of calibration the Device
Calibration date and time will be updated.
If Device Calibration is not offered on the Control Station, the Calibration Locked
indicator on power supply should go out after approximately 90 seconds. Then
calibrate power supply by pressing firmly on face label on the word “Calibrate”.
During calibration the system output will be cycled and the two Bar Type lights
will illuminate. At completion of calibration the Bar Type lights will flicker. The
indicated ion output will be high. The calibration sequence takes five to ten seconds.
The calibration data is stored in non-volatile memory and used on subsequent power
ups.