![SIMAG SVD 152 Service Manual Download Page 14](http://html1.mh-extra.com/html/simag/svd-152/svd-152_service-manual_1274636014.webp)
13
Page 15
ICE MACHINE
The use of a mechanical lift is recommended
for lifting the uncrated icemaker onto the bin.
Remove front, top and sides panels.
Place the unit directly onto the bin, align it with
the back of the bin. Locate the hardware
package, take out two mounting screws, and
use them to secure the Icemaker to the two
sides of the bin.
See illustration below.
Remove all shipping material as well as the
masking
tapes
from
the
ice
Deflector/evaporator cover.
Remove first the ice deflector/evaporator cover
then the masking tape from the ice thickness
sensor.
AIR BAFFLE
Install on the back side of the machine the air
baffle as per instruction provided with it.
STACKING INSTALLATION
To stack a second SVD onto the present one,
first remove the top panel from the lower
machine. Add a bead of food grade silicone
sealant to the top edges of the lower units
freezing compartment. Lift the top machine
onto the bottom machine, (the use of a
mechanical lift is recommended for this step).
Align the two machines cabinets, and using the
2 screw from the top units, hardware package,
fasten the two units together at the side
cabinets.
Then make use of the Stacking Kit KSC 450,
and KSC 1000, to be mounted as per fitting
instructions included in their package,
respectively on SVD 203, SVD303, SVD503
located in the bottom for proper conveying, of
the ice cubes made by the top unit, into the
storage bin.
With food grade silicone perfectly seal the edge
between the freezing compartment of the upper
machine and of the bottom machine so to avoid
any possible leak of water through the
clearance in between.
(Note: SVD152&222 NOT DESIGNED FOR
STACKING.)