46
007-4263-001
2: Installation of Customer Replaceable Components
The following instructions describe how to install the Silicon Graphics 230 Visual
Workstation system board:
1.
To mount the retaining bracket onto the system board, place the retaining hooks
into their system board holes and snap the release clip onto the board. Figure 2-23
illustrates the procedure.
Figure 2-23
Snapping Retaining Bracket onto System Board
2. The system should still be resting on its right side to facilitate the installation.
3. Place the system board into the chassis so as to align the I/O ports with their
respective holes in the I/O gasket.
4. Position the system board so as to have the standoff hooks inserted into their
corresponding holes in the system board. See Figure 2-24 for an illustration of the
procedure.
Summary of Contents for 230
Page 1: ...Silicon Graphics 230 Visual Workstation User s Guide 007 4263 001 ...
Page 3: ...007 4263 001 iii Record of Revision Version Description 001 March 2000 Original Publication ...
Page 4: ......
Page 12: ......
Page 14: ......
Page 92: ......
Page 95: ...Entering Setup 007 4263 001 79 Figure 4 2 Advanced Setup Utility Screen ...
Page 136: ......
Page 148: ......