Silicon CPV plc
Akhter House, Perry Road, Harlow, Essex, CM18 7PN, UK
Tel +44 (0) 1279 821200 Email [email protected]
Page 14 of 32
Installation Instructions for Badr – Part 1
When the Solar Street Light is delivered the
battery bank and controller is left in the “SHIP
MODE”. This will prevent excessive battery
discharge during transit.
Battery Bank and Controller Access
1.
Remove the pan pozi screw that secures the battery pack and
controller to the main light body
Correct Screw Hole for the pozi screw
2.
Carefully slide the battery and controller pack out of the main
moulding. A small amount of force may be required.