Silicon CPV plc
Akhter House, Perry Road, Harlow, Essex, CM18 7PN, UK
Tel +44 (0) 1279 821200 Email [email protected]
Page 11 of 32
Important Note:
We recommend that the change of switch selection is done by the
use of a small flat bladed screwdriver. Care must used to ensure
that the switch is in the correct position. Excessive force should
NOT be used during this operation.
Fig 2
Antenna Installation
To prevent damage during packing / unpacking of the solar street light
the antenna required for network communications is included in the
accessory bag. Please screw in place and hand tighten with pliers. Care
must be taken during this process and the Antenna should not be
overtightened.