MA MCTS II, Ver. 1.4
16
11/2018
SIGNALTEC GmbH, Reutersbrunnenstrasse 27, D-90429 Nürnberg, GERMANY, T. +49 911 2550993-0, F. +49 911 2550993-13, Email: [email protected], Web: www.signaltec.com
Fix the primary and secondary connection cable with some
cable ties at the cable harness and close rack.
Connect to power plug, switch the system on and check the
channel power.
Perform a safety test according VDE 0701 / 0702 (EN 62638).