
FC410 with Modbus
Operating Instructions, 02/2016, A5E33120874-AC
51
Commissioning
6
6.1
General requirements
Before commissioning it must be checked that:
●
The device has been installed and connected in accordance with the guidelines provided
in Installing/Mounting (Page 27) and Connecting (Page 37).
●
Device installed in hazardous area meets the requirements described in Installation in
hazardous locations (Page 16).
6.2
Warnings
WARNING
Improper handling
The sensor connected to this device can be operated with high pressure and corrosive
media. Therefore improper handling of the device can lead to serious injuries and/or
considerable material damage.
WARNING
Commissioning and operation with pending error
If an error message appears, correct operation in the process is no longer guaranteed.
•
Check the gravity of the error.
•
Correct the error.
•
If the error still exists:
–
Take the device out of operation.
–
Prevent renewed commissioning.
6.3
Operating via SIMATIC PDM
SIMATIC PDM is a software package used to commission and maintain process devices.
Further information can be found at: www.siemens.com/simatic-pdm