Service and maintenance
5.2 Regular maintenance
3VA molded case circuit breakers with UL and IEC certification
382
Manual, 01/2019, L1V30435333-01
5.2
Regular maintenance
Recommended maintenance/inspection intervals
Following initial commissioning, the equipment/system must be inspected at least once per
year.
In addition, an inspection should be carried out after 1000 cycles at rated operational current.
If the molded case circuit breaker or molded case switch (MCS) is operated in a dusty
environment or an environment with corrosive vapors, gases or salt spray, it is
recommended that the inspection intervals be adjusted, e.g. to twice per year.
Recommended inspection of the 3VA UL molded case circuit breaker / molded case switch (MCS)
Optional inspection possibilities for the ETU of the 3VA6 molded case circuit breaker