Accessories
8.9 Phase barriers
3KC0 manual transfer switching equipment
Manual, 09/2018, L1V30368969105-01
107
Procedure
1.
Shorten the phase barriers for the transfer switching equipment sizes 3 and 4 if
necessary.
2.
Insert the phase barrier into the appropriate mounting channel on the transfer switching
equipment.
–
With 3-pole types, insert 6 phase barriers per side in each case.
You will need a total of 12 phase barriers per device.
–
With 4-pole types, insert 8 phase barriers per side in each case.
You will need a total of 16 phase barriers per device.