
Siemens Industry, Inc.
Building Technologies Division
P/N 315-050537-3
5
ELECTRICAL RATINGS
All connect
All connect
All connect
All connect
All connections are supervised and power
ions are supervised and power
ions are supervised and power
ions are supervised and power
ions are supervised and power limit
limit
limit
limit
limited unless st
ed unless st
ed unless st
ed unless st
ed unless stat
at
at
at
ated otherwise.
ed otherwise.
ed otherwise.
ed otherwise.
ed otherwise. The
The
The
The
The
fiber
fiber
fiber
fiber
fiber switc
switc
switc
switc
switch ma
h ma
h ma
h ma
h may be connect
y be connect
y be connect
y be connect
y be connected to a PSC-1
ed to a PSC-1
ed to a PSC-1
ed to a PSC-1
ed to a PSC-12 (P/N 31
2 (P/N 31
2 (P/N 31
2 (P/N 31
2 (P/N 315-033060),
5-033060),
5-033060),
5-033060),
5-033060), or
or
or
or
or P
P
P
P
PAD-3 (P/N 31
AD-3 (P/N 31
AD-3 (P/N 31
AD-3 (P/N 31
AD-3 (P/N 315-
5-
5-
5-
5-
099082) or
099082) or
099082) or
099082) or
099082) or P
P
P
P
PAD-4 (P/N 31
AD-4 (P/N 31
AD-4 (P/N 31
AD-4 (P/N 31
AD-4 (P/N 315-05021
5-05021
5-05021
5-05021
5-050217) for
7) for
7) for
7) for
7) for power
power
power
power
power.....
Input Voltage: Regulated 24VDC
Input Current: 265mA @ 24VDC
Connecting to Siemens Power Supply and Building Management System
Remove all system power before installation, first battery and then AC.
(To
power up, connect the AC first and then the battery.) Figures 8 and 9 show the
general layout of the PAD-3 and PAD-4 main board, respectively. This section also
provides specific wiring details to the Siemens UL approved power supply. Consult
your control unit manual for specific wiring information on the control unit being
used.
Figure 8
PAD-3-MB Layout
AUXILIARY POWER OUTPUT
3A MAX., 18-28 VDC
SUPERVISED, POWER LIMITED
COMMON TROUBLE
RELAY CONTACT
TB2