
Page 6
Pointek CLS 300 – INSTRUCTION MANUAL
7ML19985CK03
Installation
Location
Notes:
•
Installation shall only be performed by qualified personnel and in accordance with local
governing regulations.
•
This product is susceptible to electrostatic shock. Follow proper grounding
procedures.
The Pointek CLS 300 as supplied in the standard probe lengths is normally mounted on the
vessel top (high detection alarm) or through the tank wall at the detection level (high or low
detection alarm).
The cable version is designed for top mounting. The cable suspends vertically so that it
reaches into the process at the desired detection level (high or low detection alarm).
Angle
Horizontal
Vertical
Summary of Contents for Pointek CLS300
Page 1: ...POINTEK CLS 300 CAPACITANCE LIQUIDS SOLIDS Instruction Manual December 2001 OINTEK CLS 30 ...
Page 30: ...Notes ...
Page 31: ......
Page 32: ...c 7ML19985CK03 ...