Page 20
Pointek CLS 300 – INSTRUCTION MANUAL
7ML19985CK03
Delay On
S1 - 1
Delay Off
S1 - 2
Fail-safe
S1 - 3
Delay Test
S1 – 4
Sensitivity
S1 - 5
On
Disabled
Disabled
High
Test
Normal
Off
Enabled
Enabled
Low
Normal
low
Start Up
After the CLS is properly mounted and the switch bank set up, apply power to the unit. The
green LED (L3) lights to indicate the unit is powered and operational.
Indicators
Three LEDs indication the following:
L1 (yellow) = sensor status:
When P2 is properly set, this LED indicates when
the sensor is in contact with the process material
(material capacitance is greater than set point, P2).
L1 is off when the sensor is out of contact with the
process material (material capacitance is less than
set point).
L2 (red) = output status:
This LED indicates the relay and solid switch
contact status. Refer to Operation\Output Status
below.
L3 (green) = power:
This LED is on when the Pointek CLS is properly
powered.