881-4027.9 * INSTALLATION AND OPERATING INSTRUCTIONS 8BT2 * Revision 04
63
Fig72. Operation directions of two levers to disconnect
Fig73. Rear view of withdrawable VTs
the withdrawable VT
Remove 18pcs M10 bolts from the rear cover (fig70).
Remove the rear cover.
Fig74. Dismounting L2 phase voltage transformer
Fig75. Rear access to the cable compartment
Take out L2 phase voltage transformer (fig74).
Insert again two operating layers into the hole as done in fig72.
Move two operating levers (pos.nr.
in fig71) downward at the same time to be able
to open the shutter just behind the voltage transformers
Now, it is possible to reach the cable compartment (fig75).
Power cable
Check contact surfaces of cable terminations, brush if necessary and apply a thin film
installation
of Vaseline.
Slip rubber sleeve for the metal floor plates over the cable.
Mount cable termination according to the manufacturer’s instructions.
Pull cable into connection compartment.
Connect cable at the panel connection.
ATTENTION!
The cable compartment can be destroyed if cable terminations with inadequate
dimensions are used.
Use only cable terminations with the dimensions hereafter.
Depending on the manufacturer of the cable terminations, the dimensions may
differ from those described in here. Please make sure that dimensions do not
exceed the limit values.