881-4027.9 * INSTALLATION AND OPERATING INSTRUCTIONS 8BT2 * Revision 04
29
Remove PE foil.
Remove 4 transport fixing bolts from inside the panel (fig12 – 14).
Fig12. Position of transport fixing bolts
Fig13. Bolt to remove inside at front right
Fig14. Bolt to remove inside at rear left
on right side (same on left side)
(same on left side)
(same on right side)
Prepare transport material (e.g. ropes, eyelets, roller pads (reinforced rollers), etc.).
Further transport without wooden palettes
If the transport units cannot be directly lifted from the wooden pallets onto their mounting
ATTENTION!
For further transport of a cubicle with a floor conveyor or other means of transportation
(reinforced rollers, etc.), a minimum live load of 14.5 kN/m
2
must be considered. Non-
observence of the live load can endanger people or damage the transport units during
further transport.
Please ensure that the lifting and transport gear used meets the requirements
regarding to construction and load-bearing capacity.
Lower the transport unit onto boards placed on roller pads (reinforced rollers), i.e. one
board placed on two roller pads. Distribute the roller pads so as to support the outer
edges of the transport unit (fig15).
Fig15. Transport unit on boards placed on roller pads
Lift one side, then the other side of the transport unit and slowly lower it on the