![Siemens 1PH728 Operating Instructions Manual Download Page 41](http://html.mh-extra.com/html/siemens/1ph728/1ph728_operating-instructions-manual_378970041.webp)
A5E00177602A AD
Siemens AG Operating Instructions 2.02 1PH728
39
Start-up
4
4.1
Preparations
Safety note
WARNING
Only expert personnel should be entrusted with work on power installations.
Checking the insulation resistance
After long storage or shutdown periods, the insulation resistance of the windings must be
measured to ground with direct voltage.
CAUTION
Before you begin measuring the insulation resistance, please read the manual for the
insulation resistance meter you are going to use.
WARNING
Hazardous voltage
During the measurement, and immediately afterwards, hazardous voltage levels are
applied on some of the terminals and they should not be touched. Touching live
components can be result in death or serious injury.
Never touch the terminals when measuring or immediately after the measurement.
Check the supply feeder cables connected in order to ensure that the line supply voltage
cannot be connected.
●
Always measure the insulation resistance of the winding to the motor enclosure when the
winding temperature is between 20 and 30°C.
●
When measuring, wait until the final resistance value is reached; this takes approximately
one minute.
Siemens Hardware
Summary of Contents for 1PH728
Page 2: ...17 03 2008 10 00 ...
Page 8: ......
Page 16: ......
Page 24: ......
Page 48: ......
Page 72: ......
Page 76: ......
Page 78: ......
Page 79: ...Siemens Hardware ...
Page 80: ......
Page 81: ...AB U161 Konformitätserklärung AB U151 Herstellererklärung Siemens Hardware ...
Page 82: ......