37
8024250/18HT/V2-0/2020-12| SICK
O P E R A T I N G I N S T R U C T I O N S | ZIRKOR200 Ex-G
Subject to change without notice
INSTALLATION
5
Fig. 10: Installing and insulating the analyzer unit
1
-3
°
d2
m
in
2
4
5
6
7
3
3
8
d
1
1
Analyzer electronics
2
Analyzer unit flange seal
3
Protective pipe
4
Protective pipe flange seal
5
Counter flange, welded on gas-tight
6
Process wall
7
Flue gas direction