6
Commissioning
6.1
Important information
NOTICE
Commissioning may only be performed by qualified persons.
•
Qualified persons have the specialist training, skills, experience and knowledge
of the relevant regulations and standards needed to be able to perform work
assigned to them and to identify and avoid any potential dangers independently.
•
Electricians have the professional training, skills, experience and knowledge of the
relevant standards and provisions needed to work on electrical systems and to
detect and avoid any potential dangers independently.
6.2
Configuring the system
The initial commissioning is described in a separate document. The essential steps are:
•
Installing and connecting the components
•
System configurations:
°
IP addresses
°
Internal I/O ports
°
SIM4000 / SID120
°
Ranger3
°
PLC communication
°
Calibration data
°
Encoder
°
FTP
•
Setting up the inspection objects and criteria
•
Full backup
•
Acceptance test
The necessary settings and parameters in the menus to configure the system are
described in section
.
6
COMMISSIONING
18
O P E R A T I N G I N S T R U C T I O N S | FOS-HVS
8027445/V1-0/2022-06-15 | SICK
Subject to change without notice