PROJECT PLANNING
4
4.1.2
Selecting the flange with tube
The selection of a suitable flange with tube depends on the wall and insulation thickness of
the duct wall, the nominal length of the selected sender/receiver unit and the sample gas
temperature. Flanges with tube are available which are delivered with a 3.1 material
certificate (
see “Flange with tube”, page 122
). The material pairing of the duct and the tube
should also be taken into account when a welded connection between the flange with tube
and duct is planned.
Fig. 13: Flange with tube
4.1.3
Selecting the MCUDH Ex-3K control unit
Selection of the MCUDH Ex-3K control unit depends on the required power supply unit and
the optional field bus module (
). The control units are suitable for
operation in Ex-zones 2/22.
Table 8: Selection Table for MCUDH Ex-3K control unit
Gas tempera-
ture
Nominal length of sender/receiver unit
435 mm
735 mm
< 150 °C
130, 240
130, 240, 500
Nominal length of flange
with tube (mm)
> 150 °C
240
500
Power supply unit
Fieldbus module
Type designation
Without (24 V DC)
No Fieldbus module
MCUDH N2YDN00000NNOE
Switchable 115 / 230 V AC
MCUDH NSYDN00000NNOE
Without (24 V DC)
Modbus RTU (RS485).
MCUDH N2YDN00000MNOE
Switchable 115 / 230 V AC
MCUDH NSYDN00000MNOE