5
SIAM COMPANY IS GRATEFUL TO YOU FOR ACQUIRING
SIAM-MASTER –MINI GSM AND ASKS YOU TO ADHERE TO
THE FOLLOWING MAJOR REQUIREMENTS WHEN
OPERATING THE DEVICE:
The level gauge is an electronic microcontroller device with internal
battery, keyboard, storage, etc.. When operating the device, do not hit it or
expose it to severe vibrations, acids, alkalis and strong solvents. Do not
submerge the device into liquid!
Before switching on the device for the first time or after prolonged
storage, charge the accumulators and only after it switch on the device.
Always charge the battery until it is fully charged. The charging process
must not be interrupted. Do not charge the accumulators at negative
temperatures since it results into their premature failing!
Do not carry out initialization when the battery is discharged (the
LED flashes) and do not switch off the instrument after the initialization
process has started until it is complete.
When clearing the storage it is possible to reset the date and time in
the device, but this erases all accumulated information from the level
gauge's memory without the possibility of restoring it. It is therefore
recommended to save the measurement results in the "SIAM database"
before carrying out the storage clearance.
This type of level gauge сап transfer information to а personal
computer (РС). In order to avoid errors and information losses, when
transferring the data to these tools, read attentively and strictly follow
the operational requirements of corresponding software products and
tools. Pay attention to the version of the installed software. This
tool operates in combination with "DB SIAM"
of а V2.5-version and
above.
While tightening up the well sounder on the measuring connection of
the wellhead tree, use the standard clamps on the case. No impact drivers
or level gauge body are allowed.
Do not rotate the valve of the well sounder at excessive pressure in
the working volume of the sensor! After mounting the sensor gage, turn the
valve to the desired position, and only then open the valve on the
Summary of Contents for SUDOS-mini 2
Page 2: ...2...
Page 49: ...49 Figure 2...
Page 50: ...50 Figure 3 Figure 4...
Page 51: ...51 Figure 5 Figure 6...
Page 52: ...52 Figure 7 Figure 8 Open the Control Panel System Device Manager tab...
Page 54: ...54 Figure 9...