
Section 6: Spindle and VFD Installation • May 2, 2016
© Copyright 2016 ShopBot Tools, Inc.
page 6-7
Attach Spindle
Hold the spindle up to the Z-axis extrusion and loosely attach
the six 5/16”-18 x 1-1/2” bolts to hold the spindle in place.
Use shims or an assistant to hold the spindle plate threads level
with the Z-axis through holes.
Replace Stop Screw
If the Z-axis stop screw was removed, reinstall it.
Install it snug and test the Z travel to ensure the
screw stops travel before the pinion leaves the
rack.
Summary of Contents for PRSalpha
Page 38: ...Section 3 Gantry Installation May 2 2016 Copyright 2016 ShopBot Tools Inc page 3 8 ...
Page 49: ...Section 4 Cable Carrier Installation May 2 2016 Copyright 2016 ShopBot Tools Inc page 4 11 ...
Page 50: ...Section 4 Cable Carrier Installation May 2 2016 Copyright 2016 ShopBot Tools Inc page 4 12 ...
Page 56: ...Section 5 Control Box Installation May 2 2016 Copyright 2016 ShopBot Tools Inc page 5 6 ...
Page 66: ...Section 6 Spindle and VFD Installation May 2 2016 Copyright 2016 ShopBot Tools Inc page 6 10 ...
Page 78: ...Section 8 Wire and Cable Routing May 2 2016 Copyright 2016 ShopBot Tools Inc page 8 8 ...
Page 80: ...Section 9 PRS Alpha Control Box Wiring May 2 2016 Copyright 2016 ShopBot Tools Inc page 9 2 ...