55
9. Measurement
9.1 Starting Measurement
After mounting to the control panel, wiring, setup and calibration are complete, turn
the power to the instrument ON.
For approx. 4 seconds after the power is switched ON, the following characters
are indicated on the ORP Display and Setting Display.
ORP Display
Setting Display
Unlit
During this time, all outputs are in OFF status, and action indicators go off.
After that, measurement starts, indicating the item selected in [Backlight selection
(p.49)] [ORP color (p.49)] [Bar graph indication (p.50)] [Setting Display indication
(p.50] in the Special Function group.