76(77)
cotter.
4) Close screen frame and lock screws.
5) Match pin hole behind storage hopper with pin hole in the base, then fix
hopper to frame.
Attention!
Close frame before fixing storage, otherwise hopper would be attached
to frame.
6) Place conveyor belt under hopper.
7) Close motor baffle.
8) Turn on power switch.
9) Start-up.
6.6 Maintenance Schedule
6.6.1 About the Machine
Model SN Manufacture date
Voltage
Ф
V Frequency Hz Power kW
6.6.2 Check After Installation
Check if pipe connections are firmed locked by clips.
Check the gap between fixed blade and rotating blade. (0.2~2mm).
Check the rotating balance of the belt wheel.
Electrical Installation
Voltage: V Hz
Specs of the fuse: 1 Phase A 3 Phase A
Check phase sequence of the power supply.
Operation direction of oil pump motor and conveyor belt.
6.6.3 Daily Check
Inspect main power switch.
Inspect emergency switch.
Inspect start / stop button.
Inspect motor overload protection function.
Summary of Contents for SGS-6080S
Page 1: ...SGS S Single shaft Shredders Date May 2014 Version Ver B English...
Page 2: ......
Page 8: ...8 77...
Page 24: ...24 77 2 3 3 Cutting Chamber Structure Picture 2 8 Cutting Chamber Structure...
Page 31: ...31 77 2 3 12 Pushing Device Assembly Picture 2 12 Pushing Device Assembly...
Page 37: ...37 77 2 4 Wiring Diagram 2 4 1 Wiring Diagram Picture 2 16 Wiring Diagram...
Page 38: ...38 77 2 4 2 Control Wiring Diagram Picture 2 17 Control Wiring Diagram 1...
Page 39: ...39 77 Picture 2 18 Control Wiring Diagram 2...
Page 40: ...40 77 2 4 3 Electrical Components Layout Picture 2 19 Electrical Components Layout 1...
Page 41: ...41 77 Picture 2 20 Electrical Components Layout 2...