9(33)
available to select air accumulator to enhance purging and reduce
manually clean time.
All maintenance work should be carried out by a person with technical training or
corresponding professional experience. The manual contains instructions for both
operating and maintenance. Chapter 6 contains maintenance instructions for
service engineers. Other chapters contain instructions for the daily operator.
Any modifications of the machine must be approved by SHINI in order to avoid
personal injury and damage to machine. We shall not be liable for any damage
caused by unauthorized change of the machine.
Our company provides after-sales service. Should you have any problem during
using the machine, please contact the company or the local vendor.
Headquarter and Taipei factory
:
Tel: + 886 (0)2 2680 9119
Shini Plastics Technologies (Dongguan), Inc
:
Tel: + 86 (0)769 8111 6600
Email:
Shini Plastics Technologies India Pvt.Ltd.
:
Tel: + 91 250 3021 166.
Please refer to shini.com/en/worldwide.html for local vendor near you.