6.7 Maintenance Schedule
6.7.1 General Machine Information
Model SN Manufacture date
Voltage
Ф
V Frequency Hz Power kW
6.7.2 Check after Installation
Check that the conveying pipes are tightly locked.
Check that the material clearance door is firmly closed.
Check that the conveying pipes are correctly connected.
Check if there are damages of honeycomb-rotor.
Electrical Installatio
Voltage: V Hz
Fuse melt current
:
1 Phase A 3 Phases A
Check the phase frequency of power supply.
Check rotating direction of regenerating motor.
Check rotating direction of conveying blower fans.
Check air supply of compressor
Compressed air pressure bar
Air flow L/nun
Check if the compressed air purified or not.
6.7.3 Daily Checking
Check the switch of the machine.
Check auto start-up of the machine.
Check the temperature controller.
Clean the filter.
Check whether overheat protection is normal.
Check whether dew-point is normal.
6.7.4 Weekly Checking
Check all the electrical wires.