- 34 -
<Note>
•
Procedures except for pre-operation inspection must be performed by specialized
technicians.
•
Items indicated by
: Contact the retail outlet where the equipment was
purchased.
•
Always be sure to use genuine parts when replacing parts.
•
When removing waste liquid from the equipment, place some container to collect
the liquid and prevent it from spilling on the ground. Dispose of such oil, fuel,
cooling water (LLC), filters, batteries and other harmful substances as industrial
waste in accordance with applicable laws and regulations. Consult with the retail
outlet where the equipment was purchased if you have any inquiries regarding
proper disposal.
•
When performing maintenance with the side door and other parts open, be sure
that no other persons can accidentally come close to the equipment. Close all
doors and covers if momentarily leaving the equipment unattended.
Inspection Item
Pre-
Operation
Inspection
Inspection Period
50th
hour
Every
100
hours
Every
200
hours
Every
400
hours
Every
1000
hours
Every
2000
hours
1 Inspect/Add Fuel
2 Inspect/Add Engine Oil
3 Change the Engine Oil
1st time
2nd time
and after
4 Change the Oil Filter
1st time
2nd time
and after
5
Inspect/Add Cooling
Water
6 Change Cooling Water
or 2 years
7 Clean Fuel Strainer
1st time
2nd time
and after
8 Replace Fuel Element
9
Drain Water from/Clean
Fuel Tank
10
Inspect for Fuel/Oil/
Cooling Water Leakage
11 Inspect/Add Battery Fluid
12 Clean Air Element
1st time
2nd time
and after
13 Replace Air Element
14
Drain Liquid from Spill
Containment
15 Adjust V-belt Tension
1st time
2nd time
and after
16 Replace V-belt
or 2 years
17
Clean Radiator Fan
(External)
18
Clean Radiator Fan
(Internal)
Summary of Contents for DGW340DM
Page 2: ......
Page 46: ...43 14 Engine Wiring Diagram...
Page 47: ...44 P 1 3 15 Generator Wiring Diagram...
Page 48: ...45 P 2 3...
Page 49: ...46 P 3 3...
Page 50: ...47 MEMO...
Page 51: ...48 MEMO...
Page 52: ...49 2021...