9
3. Handling of pump (Before starting operation)
1. Unpacking
(1)
Check the name of the machine shown on the box surface to see whether it is
what you ordered.
(2)
Cut the band bound on the box.
(3)
Pull up the box; the main unit of the machine and accessories will come out.
(4)
Check that the following components are included.
A. Main machine unit (One as ordered? Not damaged?) 1
B. Battery 1
C. Charger 1
D. Tool bag 1
E. Pump cover 1
The main unit is covered with a thin vinyl cover. Be sure to remove it before
operating the machine.
2. Mounting the battery
(1)
Fix the battery with the supplied rubber band to the battery box.
(2)
Connect the two (+) battery cords (red) and then (-) cord (black) with the
attached hexagon bolts and nuts.
○
When disconnecting the battery cords, disconnect the (-) cord first and
connecting, connect the (+) cord first.
⚫
If not, short circuit may result leading to a fire or you may get burnt.
(3)
Charge the battery for 2 to 3
hours.
This battery is sealed type
requiring no water
replenishment. See the
operation manual for the
battery for details.
Caution
Summary of Contents for TF516MH-AB
Page 9: ...7 2 Name of components Recoil starter side Operating side...
Page 10: ...8 2 Name of components Pump side Non operation side...
Page 38: ...36 7 Wiring diagram...
Page 39: ......