background image

Page 9

05_GP-BA-XXXXXXA-015XXX12_E0

SIDE CROSS

RAILS

10. DOOR AND SOLID END PANEL INSTALLATION

A. Hold end panel at the top center with white inner surface facing inside of the shelter. Wrap the edges of the    

     fabric panel around the end rib.

B. Disconnect top rail (the horizontal pipes that run from front to back along the top) from the end rib. Pull the

     webbing (the black strap) below the cross rail.  Reattach the top cross rail to the end rib. Repeat Step B for

     side rails (the horizontal pipes that run from front to back along the sides of the unit, near the bend in the 

     frame  where the legs meet the roof).
C. At the bottom, where the webbing exits the pocket on each side of end panel, pull webbing to remove the    

     slack. 

Be careful not to pull the webbing through the other side of the webbing pocket. 

D. Insert the “S”- Hook on ratchet into hole on the leg bend. Insert the webbing into the spindle of the ratchet    

     and pull tight. Wind the ratchet so that the webbing overlaps itself. 

     Position the end panel so that it is centered on the building before fully tightening the end panel. 

E. Tighten ratchets, alternating from one side to the other, until the end panel is centered and tight.

TOP CROSS

RAIL

WRAP END

PANEL EDGES

TO INSIDE OF 

FRAME

INSIDE VIEW OF END RIB

SIDE VIEW OF END RIB

ZIPPERS

WEBBING

NOTE:

Keep Zippers closed when tightening end panels.

IMPORTANT!

DO NOT INSERT ANY PIPES 

INTO THESE POCKETS.

WRAP END PANEL EDGES OVER AND AROUND 

PIPE TOWARDS INSIDE OF FRAME.

Insert 

Webbing 

into 

Ratchet

Webbing 

and 

Ratchet 

Securing 

End 

Panel

Summary of Contents for ShelterCoat Round

Page 1: ...d for assembly Assembly time is dependent upon the length of your building Allow approximately 15 minutes for every foot in building length Please read instructions COMPLETELY before assembly This she...

Page 2: ...ser responsable si el refugio se vuela o colapsa NOTA Si se pronostican vientos o condiciones clim ticas severas en su zona le recomendamos que retire la cubierta La cubierta del refugio puede retira...

Page 3: ...ces l ments Tous les produits doivent tre retourn s dans leur emballage original si possible Cette garantie vous donne des droits juridiques sp ci ques et vous pouvez galement avoir d autres droits qu...

Page 4: ...urerqu elle soitrectangulaire Danslapluspartdessituations desancragesadditionnelssontrecommand s ShelterLogicvoussugg reunancrageparpieds Los refugios los toldos y los garajes de ShelterLogic vienen c...

Page 5: ...Assembly Reference Mfg Part 1 11114 11 11106 2 11113 12 11179 3 11182 13 800057 4 11112 14 11131 5 11051 15 11130 6 11102 16 11133 7 11104 17 00648 8 11005 18 800454 9 11105 19 800372 10 11107 ATTENTI...

Page 6: ...ual to the width of the shelter and the length should be equal to the length of the shelter Fig 1 B Measure diagonally from corner to corner A B These measurements should be the same If they are not e...

Page 7: ...B Place the ShelterLock 800372 on the upright as shown in Fig 5 C From the outside of the rib insert the bolt through the upright and then through the ShelterLock D Place the plain end of a Cross Rai...

Page 8: ...lat and level as possible B Measure across opposite corners These distances must be equal to within 1 inch C Check that the front and rear of the frame measures 15 feet in width 15 ft Fig 8 9 INSTALL...

Page 9: ...ide of end panel pull webbing to remove the slack Be careful not to pull the webbing through the other side of the webbing pocket D Insert the S Hook on ratchet into hole on the leg bend Insert the we...

Page 10: ...et on both ends of the pipe but the center of the pipe is exposed For long buildings it may be necessary to use additional pipes in the middle Fig 11B C Tie the rope on each of the exposed pipes and t...

Page 11: ...he webbing into the spindle of the ratchet and pull tight Wind the ratchet so that the webbing overlaps itself C Slide cover rails 11105 through fabric pockets at each leg and reattach with clamps to...

Page 12: ...on 3 heures Le temps de montage d pend de la longueur de votre b timent Veuillez pr voir environ 15 minutes pour chaque pied de longueur du b timent Veuillez lire TOUTES les instructions avant d entre...

Page 13: ...MANQUANTE ET POUR TOUTE PI CE DE RECHANGE OU TOUTE QUESTION VEUILLEZ COMMUNIQUER AVEC LE SERVICE LA CLIENT LE 1 800 524 9970 CANADA 1 800 559 6175 Nervures centrales Tube sup rieur Rail lat raux Rails...

Page 14: ...argeur de l emplacement doit tre au moins gale la largeur de l abri et sa longueur celle de l abri fig 1 B Mesurez la distance en diagonale entre les coins A et B Cette distance doit tre gale dans tou...

Page 15: ...et B Placez la pi ce ShelterLock 800372 sur le montant comme le montre la Fig 5 C partir de l ext rieur de la nervure ins rez le boulon dans le montant puis dans la pi ce ShelterLock D Alignez l extr...

Page 16: ...doit tre aussi plane que possible B Mesurez la distance qui s pare les coins oppos s X et Y Cette distance doit tre la m me 1 pouce pr s C Assurez vous que les sections avant et arri re de l armature...

Page 17: ...neau tirez sur la sangle pour tendre le panneau Faite bien attention de ne pas trop tirez sur la sangle pour vitez qu elle disparaisse de l autre cot du panneau D Ins rez le crochet en S dans le trou...

Page 18: ...t et l arri re de l armature fig 11A B Repliez le c t le plus proche de l armature de sorte que le fourreau pour tuyau soit accessible Ins rez un tuyau de toile la premi re nervure centrale partir de...

Page 19: ...ixez les avec une bride chaque pied R p tez cette tape de l autre c t Appuyez sur les rails de toile pour tendre la toile avant de serrer compl tement les boulons D V rifiez les cliquets et les rails...

Reviews: