Page 10
05_GP-BA-XXXXXXA-015XXX12_E0
A
. Lay the cover on the ground next to the
frame with the inside of the cover (the side
with the pipe pockets) facing down and the
webbing on the front and rear of the corner
of the building. Position the cover so that it is
centered to the frame, front to back. Fig. 11A
B.
Fold over the side closest to the frame so
the pipe pocket is now accessible. Insert a
cover pipe at the first middle rib from the front
and the first middle rib from the rear so that it
is inserted in the pipe pocket on both ends of
the pipe but the center of the pipe is exposed.
For long buildings it may be necessary to use
additional pipes in the middle. Fig. 11B.
C.
Tie the rope on each of the exposed pipes
and throw the other end of the rope over the
frame. Fig. 11C.
D.
Move to the other side of the frame and
pull the cover over the frame with the rope.
This may require two or more people.
Fig. 11D.
11. INSTALLING THE COVER ON THE FRAME
END PANELS
NOT SHOWN
FOR CLARITY.
NOTE: CHECK THAT YOUR COVER IS
CORRECTLY PLACED ON THE FRAME.
The ShelterLogic
®
logo should line up on the left front and
right rear corners near the top rail. If the logo is not legible,
the cover has not been put on the frame correctly.
Fig.11A
Fig.11B
Fig.11C
Fig.11D