![shelolab SM10HP-2 Installation And Operation Manual Download Page 7](http://html1.mh-extra.com/html/shelolab/sm10hp-2/sm10hp-2_installation-and-operation-manual_1255392007.webp)
7 |
P a g e
Figure 1: SMO34HP-2
RECEIVING YOUR OVEN (CONTINUED)
O
RIENTATION
P
HOTOS
Permanent Connect Wire Braid
6 gauge, 6 inches (15 cm)
Exhaust
Vent
Intake
Vent
Power Panel (Back)
Control Panel
Temperature
Sensor Probes
Chamber Gasket
Power Exhaust
Outlet 6-20R
Fuse Holders for External
Receptacle (2 amps each)
Chamber Ceiling Liner
Power Supply Feed
Shelf Standard Mounting
Rail
Summary of Contents for SM10HP-2
Page 17: ...17 P a g e GRAPHIC SYMBOLS CONTINUED This page left blank ...
Page 20: ...20 P a g e OPERATION CONTINUED This page left blank ...
Page 27: ...27 P a g e OPERATION CONTINUED This page left blank ...
Page 33: ...33 P a g e OPERATION CONTINUED This page left blank ...
Page 43: ...43 P a g e REPLACEMENT PART LIST This page left blank ...
Page 44: ......