4.7: Removing the MP200 Unit From Service/Reinstalling the
MP200 Unit
WARNINGS!
• Before attempting any work on the MP200 unit or associated
components, all power must be removed and all circuits
de-energized. Verify the de-energized status of all circuitry with
appropriate portable measuring equipment.
• If the MP200 unit was directly wired to the CTs without a shorting
block as disclosed in this manual, then all the electrical primary
circuits
must be shut down
prior to removing the meter. Failure to
do so could result in possible high voltage on the open CT terminals.
AVERTISSEMENT!
• Avant de tenter un travail sur l'unité MP200 ou sur les composants associés, toutes
les alimentations doivent être enlevées et tous les circuits mis hors tension. Vérifiez
le statut de mise hors tension de tous les circuits avec l'équipement de mesure por-
table approprié.
• Si l'unité MP200 a été directement branchée sur le transformateur de courant dans
un court-circuit comme indiqué dans ce manuel, alors tous les circuits électriques
primaires doivent être éteints avant d'enlever le compteur. Le non-respect de cette
indication pourrait résulter à une haute tension sur les bornes de transformateur de
courant ouvert.