4: Electrical Installation
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Electro
Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
3. Service: Three Phase, 3-Wire Delta Service with Direct Voltage and 2 CT
Connection for Metering 8 Three Phase Loads: MP200-Y
NOTES:
• All CTs must have one side grounded to reduce shock hazard.
• You must order the MP200-Y unit for the three phase operation.
• EIG highly recommends using shorting blocks like the EI SB-6TC so that the meter
can be removed from service while the CT is energized.
• 8 shorting blocks should be used for all 8 three phase circuits.
I1-LO
LOAD
V2
V1
LINE
I1-HI
V1
I3-HI
V3
V3
V2
I3-LO
SERVICES: DELTA, 3 WIRE.
Power Supply
Connection
CT Shorting Block
EI# SB-6CT
Only one 3 phase circuit is shown.
Duplicate for additional circuits.
Earth Ground
Earth Ground
Earth Ground
FUSES
2 x 0.1A
FUSE 3A
CONNECTION TYPE: NO PTs, 2 CTs
C
B
A
L(+) N(-)
Not connected to meter