12
2.3.
Transport
The pit lift can be transported standing or lying. The oil filling nozzle
with integrated oil dipstick is replaced during transport by a tightly
sealing stopper. This stopper must be replaced by the oil filling nozzle
-
before commissioning
3. Installation
3.1.
General
l
The pit lift should be installed by the manufacturer’s or the sales
company‘s trained installers. If the site operator has sufficiently trained
installers (experts), the pit lift can also be installed by them.
The correct installation and commissioning must be inspected by an
expert and confirmed in the commissioning log on page 4.
3.2.
Setup and installation location HKE
Adjustable chassis:
• The chassis is suited for a spacing of 860 to 1,000 mm between the
running rails.
• The up to 14,5 t adjustable roller axles must be set so that the dis
-
tance between the roller collar and the running rails is no more than
10 mm.
• Push the chassis once along the entire length of the pit to ensure
this.
• The distance from the roller collar to the pit running rail must not
exceed 10 mm at any point!
• In this position, the M10 safety bolts must be drilled. To do this, first
tighten the bolts so that the tip of the bolt presses into the axle.
• Then drill the axle with an 8 mm drill bit. Secure the safety bolts with
lock nuts after tightening.