52
5 Maintenance
5.1.1.2 Frequency
The frequency of the device inspection depends on the appli-
cation.
Application
When to test
Legal basis
Inspection above
ground
Before starting work and
if out of use for long pe-
riods
Plants
Weekly to every six
months
Measuring in bar
holes
Structure
Gas measuring
Warning %LEL
Every day before starting
work
Warning ExTox
Ethane analysis
Quarterly
If the integrated device inspection is switched on, the device will
remind you to perform a device inspection.
The applications are grouped together for the device inspection.
The device inspection must be performed separately for each
group.
Devices with multiple gas types
For devices that are designed for multiple gas types, the device
inspection must be carried out for the gas type currently being
used. The device inspection can also be carried out for other
available gas types.
Note:
If the device inspection symbol appears after changing the gas
type, the device inspection must always be carried out immedi-
ately.