![Sercel GRC ESP Series Field Installation Manual Download Page 25](http://html1.mh-extra.com/html/sercel/grc-esp-series/grc-esp-series_field-installation-manual_1245816025.webp)
Doc No. 006-0211-00 Rev AD
Page 25 of 62
Figure 19b. Surge Protector Schematic and Connections
Surge Protector/Fuse Block Connections 1 - 8
1. No Connection
2. Gauge signal wire to SPS-1500 or Scout-3000
3. No Connection
4. To three-phase choke Y-point
5. No Connection
6. Gauge ground to SPS-1500 or Scout-3000
7. Dedicated wellhead ground
8. No Connection
Assembly Connections
1. Once the tubing is installed and the cable is terminated at the junction box,
check the sensor with the SCOUT at the junction box. This will ensure that
everything is good downhole and the rig crew can proceed with their rig down.
2. Record the parameter readings on the Fortress ESP Sensor Checklist.
3. Mount the Surface Choke and Surge Protector (Suppressor) inside the
transformer cabinet.
4. Reference Figures 18 & 19 to see the electrical connections.
Surface Choke Tips
1. Make sure that the Surface Choke wires that are connected to the
transformer are braided.
2. If longer cable is needed from the Transformer to the Surface Choke, make
sure that it is rated for the Transformer voltage.
3. Each wire from the surface choke connects to one phase of the transformer.
Late model
Surge Panel
Protectors
have a bleed
resistor
installed
across the
MOV (pin7 to
pin 8) to
dissipate
static line
charges.