![Sercel GRC ESP Series Field Installation Manual Download Page 18](http://html1.mh-extra.com/html/sercel/grc-esp-series/grc-esp-series_field-installation-manual_1245816018.webp)
Doc No. 006-0211-00 Rev AD
Page 18 of 62
Now slide the second piece of heat shrink tubing down to the base of the threaded pin.
This will go over the first heat shrink tubing. Refer to Fig. 13a.
Figure 13. WYE Connector Shown with the
Second Heat Shrink Tubing.
Apply heat to the heat shrink to complete the assembly. Refer to Fig.13b for final
assembly.
Figure 13b. WYE Connector Terminal Shown with
Both Heat Shrink Tubing Shrunk.