![Sentek RT6 Hardware Manual Download Page 31](http://html.mh-extra.com/html/sentek/rt6/rt6_hardware-manual_1244388031.webp)
CHAPTER 4: SYSTEM INSTALLATION
Page 27
Chapter 4: System Installation
Note:
It is essential that site selection and probe
configuration planning be done before starting
physical assembly and installation in the field.
This planning is described in both:
Access Tube Installation Manual, and
EasyAG installation manual
At the end of this planning the required components
can be ordered and the probe configurations are
known.
It is recommended that the probes be built in an office
environment then normalized before installation in
access tubes in the field.
This chapter discusses the physical installation and
electrical connection of the logging facility, solar
panel and probes.
For information on the software see the IrriMAX
Manuals.
Positioning
Mounting poles
The aluminium mounting poles are used to mount the
logging facility and solar panel. Care should be taken
when selecting the position of the mounting pole to
ensure that there are no buried pipes or cables in
close proximity.
Logging Facility
The logging facility should be attached onto the
mounting pole in a position that gives easy access to
the user and is out of the way of machinery. The
logging facility should also be placed away from the
access tubes to avoid compaction of the surrounding
soil.
Solar Panel
The solar panel is mounted on top of its mounting
pole so that it is free from obstruction of current and
potential crop canopy.
Summary of Contents for RT6
Page 1: ...Sentek RT6 HARDWARE MANUAL Version 3 2 February 2011 ...
Page 2: ......
Page 4: ......
Page 8: ...SENTEK Page 4 ...
Page 30: ...SENTEK Page 26 ...
Page 46: ...SENTEK Page 42 ...
Page 50: ...SENTEK Page 46 ...
Page 62: ...SENTEK Page 58 ...
Page 63: ...APPENDIX A Page 59 APPENDIX A System Overview ...
Page 64: ...SENTEK Page 60 ...
Page 65: ...APPENDIX B Page 61 APPENDIX B System configuration examples ...
Page 66: ...SENTEK Page 62 ...
Page 67: ...APPENDIX C Page 63 APPENDIX C Probe configuration examples ...
Page 68: ...SENTEK Page 64 ...
Page 69: ...APPENDIX D Page 65 APPENDIX D Front panel visual ...
Page 70: ...SENTEK Page 66 ...
Page 71: ...APPENDIX E Page 67 APPENDIX E Overlay diagram RT6 Main Board Overlay ...
Page 72: ...SENTEK Page 68 ...
Page 73: ...APPENDIX F Page 69 APPENDIX F Cable Wiring Order 5 wire Connector ...
Page 74: ...SENTEK Page 70 ...
Page 78: ...SENTEK Page 74 ...
Page 80: ...SENTEK Page 76 ...
Page 82: ...SENTEK Page 78 ...