2.4 Exhaust Port & Fresh Air Inlet

There are two small ports on the left side of the charging port (see Figure 1). The Fresh air 
inlet port will draw clean air in during an active test. The incoming air automatically counts as a 
fresh air (O2, 20.9%vol).
The Exhaust port is the inverse of the Fresh air inlet port. During an active test, the used test 
gas will exit the unit through the exhaust port. Optionally, tubing can be attached to the 
exhaust port using the included twist connector to direct the used test gas to a suitable 
location. 

2.5 Installation of Gas Cylinder

Gas Cylinder which fits to Docking Station II must have the C10 fitting on it. The size of 58L 
and 116L are both suitable in cylinder compartment. Before installing the cylinder for testing 
SGT, ensure that Calibration concentration of gases are as same as SGT.

To install a cylinder, follow the below:

Remove thumbscrews and lift the handle up.

Install the cylinder to the gas regulator.

Fasten the cylinder straps and close the cylinder compartment.

Check the pressure gauge on the front panel.

Re-install thumbscrews.

After installing a gas cylinder, ensure USB is attached.

3. Testing 

3.1 Calibration

Calibration is the comparison of measurement values delivered by a device under test with 
those of a calibration standard of known accuracy. It is very important to calibrate a device 
periodically for better performance of the device and sensor accuracy, especially, when it is 
safety equipment.

To perform a calibration, follow the below:

Insert the monitor(s) into the bay facing down.

Slightly press down on the monitor until it locks into place.

Press the calibration button for 2 seconds to execute Calibration test.

During the 90seconds, bay LEDs begin to light as the test progress.

When test is finished, all (six) blue Bay LEDs illumination indicates if the SGT has passed 

the test (see Figure 3).

Otherwise, the third blue Bay LED illumination indicates if the SGT has failed the test (see 

Figure 3).

Bump test and calibration are the key features to ensure the safety of devices and users. The 
SGT Docking Station version II provides bump testing, event management and calibration from 
a simple to use multi-unit station. 

SGT Docking Station version II

Summary of Contents for SGT

Page 1: ...SGT Docking Station Version II User s Manual SGT Docking Station version II...

Page 2: ...ation of Gas Cylinder 3 Testing 3 1 Calibration 3 2 Bump Test 4 Trouble Shooting 5 Docking Station II Manager Software 5 1 Software Installation 6 Connecting to the SGT Docking Station II 6 1 Connecti...

Page 3: ...ice may cause a sudden reading change and cause the device malfunction Do not leave or use the device at the watery place or at where there is any liquid Do not use a device which has been failed the...

Page 4: ...arge fleets It also maintains all the important event logs that demonstrate users are working within company requirements 4 1 2 Instructions and Parts 1 1 Description SGT Docking Station version II a...

Page 5: ...x 21 3cm 20 66 x 17 20 x 8 40 Weight Without cylinder 11 0kg Temperature 41 to 104 F 5 to 40 C Warranty Full 2 years Battery Type Rechargeable Lithium Ion Battery Life Up to 1 000 Bump Tests LEDs 6 B...

Page 6: ...six blue LEDs see Figure 2 which indicates the process status Each of them will turn on by order from left to right while testing After testing is finished make sure all six bays are turned on otherw...

Page 7: ...ompartment Check the pressure gauge on the front panel Re install thumbscrews After installing a gas cylinder ensure USB is attached 3 Testing 3 1 Calibration Calibration is the comparison of measurem...

Page 8: ...has passed the test see Figure 3 Otherwise the third blue Bay LED illumination indicates if the SGT has failed the test see Figure 3 SGT has passed the test six LEDs SGT has failed the test only 3rd L...

Page 9: ...s The software can adjust and make changes to the Docking Station and the SGT units using SENKO IR Link and or partly USB Disk 5 1 Software Installation After downloading the file navigate to the save...

Page 10: ...10 The Installation will be ready to begin Click Install SGT Docking Station version II...

Page 11: ...s only when it is placed into the Bay 1 USB drive must be installed to store the test results Do not open the software if IR Link is not plugged to PC When the Docking Manager software opened the fiel...

Page 12: ...fter few seconds Read complete message will be displayed and current settings of Docking Station II will be showed on the interface Figure 4 Note If Send timeOut message displays the IR Link has faile...

Page 13: ...are Upgrade Self Test interval 0 20 hours Display mode Remain life Measuring mode Reading or Writing configuration on Docking station Enable Disable Cal Bump Test Serial Number Firmware Version Maximu...

Page 14: ...cking Station II and will discard any unsaved changes in the Tab Calibrate If the box is not selected calibration process will not proceed by pressing Calibration button However it will still update f...

Page 15: ...it can display remain lifetime of unit or measuring gas concentration Gas Concentration This allows a user to enter amend correct concentration of the installed gas cylinder on Docking Station II It i...

Page 16: ...fresh button to view and download the latest logs After clicking Refresh button all logs will be available to view see Figure 7 To download the logs follow the below Plug the IR Link into a USB port o...

Page 17: ...esting or calibrations Any unauthorized attempt to repair or modify the product or any other cause of damage beyond the range of the intended use including damage by fire lightening water damage or ot...

Reviews: