background image

13

7. Using Software

7.1 Overview of Software

Figure 6

SGT Docking Station version II

Detector User ID

Calibration interval: 0~365 days

Low / High Alarm Setting

Bump interval: 0~365 days

To connect with USB

To connect with IR Link

Cal. Gas

Concentration

Firmware 

Upgrade

Self-Test interval: 0~20 hours

Display mode

-Remain life

-Measuring mode

Reading or Writing 

configuration on Docking 

station

Enable/Disable

Cal./Bump Test

Serial Number

Firmware Version

Maximum Bump Time

(20 ~ 120sec)

Save power Mode 

(1 ~ 3600sec)

Bump result decision

- Beep

- Concentration

- Beep + Concentration

Docking 

Station 

firmware 

upgrade

Location

Gas Expiration 

date on cylinder

Cylinder No.

Reading or Writing 

configuration on Docking 

station

Figure 5

Summary of Contents for SGT

Page 1: ...SGT Docking Station Version II User s Manual SGT Docking Station version II...

Page 2: ...ation of Gas Cylinder 3 Testing 3 1 Calibration 3 2 Bump Test 4 Trouble Shooting 5 Docking Station II Manager Software 5 1 Software Installation 6 Connecting to the SGT Docking Station II 6 1 Connecti...

Page 3: ...ice may cause a sudden reading change and cause the device malfunction Do not leave or use the device at the watery place or at where there is any liquid Do not use a device which has been failed the...

Page 4: ...arge fleets It also maintains all the important event logs that demonstrate users are working within company requirements 4 1 2 Instructions and Parts 1 1 Description SGT Docking Station version II a...

Page 5: ...x 21 3cm 20 66 x 17 20 x 8 40 Weight Without cylinder 11 0kg Temperature 41 to 104 F 5 to 40 C Warranty Full 2 years Battery Type Rechargeable Lithium Ion Battery Life Up to 1 000 Bump Tests LEDs 6 B...

Page 6: ...six blue LEDs see Figure 2 which indicates the process status Each of them will turn on by order from left to right while testing After testing is finished make sure all six bays are turned on otherw...

Page 7: ...ompartment Check the pressure gauge on the front panel Re install thumbscrews After installing a gas cylinder ensure USB is attached 3 Testing 3 1 Calibration Calibration is the comparison of measurem...

Page 8: ...has passed the test see Figure 3 Otherwise the third blue Bay LED illumination indicates if the SGT has failed the test see Figure 3 SGT has passed the test six LEDs SGT has failed the test only 3rd L...

Page 9: ...s The software can adjust and make changes to the Docking Station and the SGT units using SENKO IR Link and or partly USB Disk 5 1 Software Installation After downloading the file navigate to the save...

Page 10: ...10 The Installation will be ready to begin Click Install SGT Docking Station version II...

Page 11: ...s only when it is placed into the Bay 1 USB drive must be installed to store the test results Do not open the software if IR Link is not plugged to PC When the Docking Manager software opened the fiel...

Page 12: ...fter few seconds Read complete message will be displayed and current settings of Docking Station II will be showed on the interface Figure 4 Note If Send timeOut message displays the IR Link has faile...

Page 13: ...are Upgrade Self Test interval 0 20 hours Display mode Remain life Measuring mode Reading or Writing configuration on Docking station Enable Disable Cal Bump Test Serial Number Firmware Version Maximu...

Page 14: ...cking Station II and will discard any unsaved changes in the Tab Calibrate If the box is not selected calibration process will not proceed by pressing Calibration button However it will still update f...

Page 15: ...it can display remain lifetime of unit or measuring gas concentration Gas Concentration This allows a user to enter amend correct concentration of the installed gas cylinder on Docking Station II It i...

Page 16: ...fresh button to view and download the latest logs After clicking Refresh button all logs will be available to view see Figure 7 To download the logs follow the below Plug the IR Link into a USB port o...

Page 17: ...esting or calibrations Any unauthorized attempt to repair or modify the product or any other cause of damage beyond the range of the intended use including damage by fire lightening water damage or ot...

Reviews: