AQUACULTURE|CONTROL
14
Initial operation
Scope of delivery
o
1 x SENECT® Control with 2.7 m power cable
o
1 x wall bracket set
o
1 x spare fuse set consisting of 3 microfuses 2 AT, 4 AT, 8 AT (not with
ONE, TWO, MONITOR|4)
o
1 x instruction manual
Please make sure that the packaging was undamaged and not opened before
commissioning and that all positions marked in the scope of delivery are
present. If you notice any defects, damage or the absence of items included in
the scope of delivery, please report this immediately within 14 days. Later
complaints regarding defects that have already arisen before commissioning cannot be
accepted.
Positioning and mounting
Choose a location for the SENECT® Control unit that is dry and protected from
direct sunlight. Ensure that all cables are routed cleanly so that no safety
hazards can arise, e.g. due to "tripping hazards" or water ingress into electrical
components such as plugs.