Startup and Operation
Important:
Most problems occur during the first hours of operation. These can be eliminated by careful
review of this operation manual.
Warning:
Use only intended materials in the disintegrator (see
Acceptable Materials and Feed Rates
, page
13) or jamming may occur. To clear jams, see
Troubleshooting
, page 41.
New Operators:
It is recommended to give new operators approximately two hours for a break-in period
beginning with a slow feed rate to familiarize themselves with the unit.
Pre-Start-Up Procedure
•
Familiarize yourself with all controls and button locations.
•
Familiarize yourself with the acceptable media for this unit.
•
Confirm the flex vacuum hose and communication cable connection between vacuum fan system
and the SSD2-HS disintegrator.
Flex
vacuum
hose
Communication cable
Flex
vacuum
hose
Disintegrator
Vacuum fan system
(waste evacuation system)