Section 6: Operations
Operating the System
Sacksafoam II Model 8044 Operations Manual
(Version C)
13
Section 6: Operations
Operating the System
Please perform the installation, testing and preflight inspection as previously described before operating the
Sacksafoam II. This section should be read in conjunction with the Bambi bucket operations manual.
1.
Place a full container of foam into one or both spaces of the Sacksafoam case.
2.
Insert the dip tubes into the containers. Press in the rubber stoppers.
3.
Refer to the
chart on the side of the Sacksafoam case
to set the controller box with the correct
foam dispense time. The dispense time will vary with the size of the Bambi bucket you are using
and the desired foam concentration.
4.
After the Bambi bucket has been filled with water, operate the controller box dispense switch to
pump foam down to the bucket.
5.
There are two red lights on the Sacksafoam control box, which,
when lit, indicate that a foam container is empty. Replace the
corresponding foam container with a full one. If you are unsure
which container is empty, this can be determined by pulling the
dip tube towards the top of the pail. If the other light does not
come on, you have the right container.
6.
While changing the foam containers, the dip tube can be stored
in the black storage tube.
Important Note
If you have an existing controller box with a black plastic case, disregard the dispense time chart
on the top. It applies only to original Sacksafoam I units.
Dip tube placed inside the
black storage tube.