− 34 −
2−5 MAIN TEST MODE
In main test mode, it is possible to test and change settings for the main unit.
If only one side of the main projection unit is put into test mode, the other side will display an
error screen, so that side should also be put into test mode.
①
②
③
<<MAINTESTMODE>>
OUTPUTTEST
DLPCOLORTEST
SYNCHRONOUSTEST
->EXIT
SELECTWITHSERVICEBUTTON
ANDPRESSTESTBUTTON
FIG. 2. 5 a Main Test Menu screen
After changing the settings, select EXIT and press the TEST Button to return to the Game Test
Menu screen.
① OUTPUT TEST
The output test enables testing of the lighting illumination.
The marker display shifts automatically when the output test is selected and normal LED
operation is confirmed when the (LED) row illuminates.
Only the left-hand main monitor (projector) can be used for output testing.
<<OUTPUTTEST>>
□□□□□□□□□□
PRESSTESTBUTTONTOEXIT
FIG. 2. 5 b OUTPUT TEST screen
After changing the settings, select EXIT and press the TEST Button to return to the Main Test
Menu screen.