Rostock Max Assembly Guide
21
8 – Installing the T-Slot Hardware in the Base
8.1 - Installing the three T-Slot rails uses 12 each of the 1/4-20 x 1/2" button head cap screws
and 12 each of the 1/4-20 t-slot nuts.
Figure 27 - T-Slot Hardware
8.2 - When installing the fasteners, orient the t-slot nut with the "boss" or protruding thread
area facing the inside of the T-Slot rail as shown below:
Figure 28 - Orientation of T-Nut Boss
8.3 - Install four screw/nut pairs in each rail location as shown below
Figure 29 - T-Slot Nuts Installed