The installer must ensure the dropper is suitable, and is secured 
adequately for wind conditions at the site. Additional restraints 

may be required if the cooler is more than 200mm (8”) higher 

 

than the roof timbers, or design wind velocity at the site 

exceeds 43m/s (141fps).

In exposed or very high wind areas use 16 screws, minimum 

shank diameter 5.2mm (7/32”) to secure the dropper. In areas 

subject to cyclones/hurricanes/windstorms or where the cooler 

is located more than 8m (26’) above the ground seek advice 

from a structural engineer. 

Important!

 Ensure the Weatherseal operation is not hindered 

by the attaching screws.

EXTRA NOTES FOR EZQ MODEL ONLY

EXTRA NOTES FOR EZQ MODEL ONLY

EXTRA NOTES FOR EZQ MODEL ONLY

Fit & secure the transition to the top of the dropper, 

repeating the same fixing rationals for exposed, high 

wind areas, cyclones etc.

Important! 

The flashing should go up, but not higher 

than 20mm above the bottom of the transition and may 
not add more than 7mm girth to the dropper including 
fasteners. This ensures a neat installation. 

The dropper may now be flashed to the roof. Make sure there is 

no chance of water entering the roof space.

MOUNTING THE DROPPER cont.

LEVELLING THE DROPPER / TRANSITION

Ensure the top of the dropper (or transition for EZQ model) is 

level and square in all directions (use a spirit level). This helps 

with levelling the cooler. 

ILL2129-A

Ensure duct insulation is firmly held in against the duct. 

SECURING THE DROPPER & TRANSITION

Place level vials in side wells provided in the transition. 

Pivot the transition/dropper off the appropriate gauge 

timber (top or bottom) until the level reads true. Hold 

dropper in place using one single screw into the rafter. 
This will set the dropper at an angle of 24°. Check for 
lateral level by placing level vials in the top or bottom 
wells.

Note! 

Very few roof slopes will contact both gauge timbers 
once the dropper is properly levelled. As a general rule: 

•  For roof angles less than 26°, only the bottom gauge 

will apply. 

•  For roof angles greater than 26°, the top gauge will be 

used. 

This will be apparent when checking for level via the 
level vials.

Note! 

The height gauges are intended to work off the 

top nominal surface of the roof. Uneven roof surface 
e.g. Tiles may require some packing up.
Once the dropper is secured, remove the gauges and  
transition so that the dropper can be sealed. 

SEALING THE DROPPER

CONVEYING THE COOLER TO THE ROOF

EXTRA NOTES FOR EZQ MODEL ONLY

ILL1667-A

Also remove the lower pads, as they may fall out when 
transporting the cooler to the roof.

Lifting and installing the cooler is made easier by removing the 

pad frames first. They can be replaced at the very end of the 

installation procedure. 

Do not slide the cooler, lift and carry it.  It is recommended 
that at least 2 people carry the cooler whenever it needs to be 
moved. Do not drop the cooler. Always handle with care.

Important! 

For lifting or pulling purposes when using ropes or 

slings, always apply the ropes around fan housing. Never tie 
them to any or all of the 4 round corner posts.

WARNING! 

Take care that the ends of ladders, etc. don’t 

penetrate into the opening of the cooler, as the Weatherseal or 

the cut-off plate may be damaged.

CAUTION! 

Never try to raise the cooler to the roof alone.

Summary of Contents for EXQ

Page 1: ... English INSTALLATION MANUAL EXQ EZQ EXS Evaporative Coolers ILL1672 A Original English Instructions ...

Page 2: ...NG THE DRAIN VALVE OR BLEED TRAY 11 HARMONY AND HORIZON DRAIN VALVE ASSEMBLY 11 HOMEMAKER BLEED TRAY 11 CONNECTING THE MAGIQTOUCH MAGIQCOOL CONTROLLER 12 COMMISSIONING THE COOLER 12 Diagnostic LED 12 Salinity LED 12 MagIQtouch Controller Information 13 External Air Sensor Feature 13 TESTING THE DIRECT DRIVE MOTOR 13 CHANGING THE WATER MANAGEMENT METHOD FOR THE MAGIQCOOL CONTROL 13 SETTING THE WATE...

Page 3: ... If a worker is alone who knows they are there and if they get into difficulty how can they summon help Call someone on the ground Mobile phone etc What condition is the roof in Should the trusses underside or surface be checked Does the worker have appropriate foot wear Flat sole jogger type is advisable Are all power cables extension leads safe and appropriately rated Are all ladders tools and e...

Page 4: ...tronics Test the Direct Drive motor STEP 21 CLEAN UP Clean up the site STEP 3 PREPARE DROPPER Cut hole fit grommet in dropper for cables STEP 8 CONTROLLER CABLE Connect one end of the controller cable to cooler electronics then feed the other into dropper Page 1 Page 7 Page 12 Page 16 Page 4 Page 12 Page 16 Page 8 Page 5 STEP 7 POWER CABLE Unhook the plug under the cooler Feed power cable down int...

Page 5: ...r STEP 10 REGULATIONS Read adhere to the local national electrical and plumbing regulations STEP 17 REFIT PAD FRAMES Refit the pad frames before testing the pump STEP 5 CONVEY COOLER Convey the cooler to the roof Note Always use 2 people when handling manually STEP 11 INLET SOLENOID Fit the solenoid Connect the cable Connect the water supply Install the drain pipe STEP 18 TEST PUMP Turn on the coo...

Page 6: ... flue 5m 17 from a sewer vent and 600mm 2 from a wall The cooler must be mounted at least 3m 10 preferably 5m 17 away from any TV antenna or antenna cables Make sure the cooler is not between the antenna and the transmission tower that is providing the television signal to the home Allow adequate access to and around the cooler for maintenance Provision must be made for access to electricity water...

Page 7: ...atherseal Before transporting to the roof temporarily screw the transition to the dropper using a screw in each corner Affix gauge timbers under the top and bottom edges of the transition with 30mm 1 2 screws supplied ILL1646 A ILL951 B EXTRA NOTES FOR EZQ MODEL ONLY MOUNTING THE DROPPER EXQ EXS MODEL EZQ MODEL ILL1647 A ILL182 H Install the dropper and securely fix it to the roof structure on 3 s...

Page 8: ...ion Pivot the transition dropper off the appropriate gauge timber top or bottom until the level reads true Hold dropper in place using one single screw into the rafter This will set the dropper at an angle of 24 Check for lateral level by placing level vials in the top or bottom wells Note Very few roof slopes will contact both gauge timbers once the dropper is properly levelled As a general rule ...

Page 9: ...the low gutter side of the installation EXTRA NOTES FOR EZQ MODEL ONLY ILL1292 B Important Ensure the four tab screws which are removed to separate the transition from the cooler are re fitted behind the tabs after the cooler has been fitted into position Carefully lift the cooler onto the transition piece and lower downwards ensuring all nine clips have engaged ILL1649 A ILL1650 A ILL525 D Check ...

Page 10: ... dropper grommet before fitting ductwork Note The maximum length for the wall control cable to travel alongside the power cable is 10m 33 WARNING Do not let the cable the cable ends or the control box get wet Position the cable in the dropper so they will be accessible from inside the roof space INSTALLING THE MAINS POWER CABLE The power cable included with your cooler will either have a mains soc...

Page 11: ...ed directly onto the manual water shut off valve Always ensure that the water pipe connection does not place sideways strain onto the float valve Homemaker A permanent water supply is required to be connected to the float valve The water connection point is located on the underside of the cooler The water connection fitting is a 1 2 BSP male adaptor suitable for a compression fitting Do not fit th...

Page 12: ... been fitted place the cover over the assembly Make sure the solenoid valve cable is retained in the groove in the cooler tank Secure the cover by tightening the flexible hose assembly nut C Important Make sure the cable cannot lay in the water at any stage Connect the electrical leads to the solenoid The electrical cable leads may be connected to the solenoid either way around Important If freezi...

Page 13: ... drain adaptor Make sure the drain water discharge flows freely away from the cooler Important Do not over tighten plastic fittings Connect the drain valve cable to the cooler electronics box HARMONY AND HORIZON DRAIN VALVE ASSEMBLY Assemble the drain valve as shown HOMEMAKER BLEED TRAY Fit the bleed tray as shown Screw the nut up tightly by hand underneath the cooler Do not overtighten Note Make ...

Page 14: ...lets in the following lengths Part No Length Details 833880 20m MagIQtouch Controller Cable No Ferrite 823553 20m MagIQtouch Controller Cable With Ferrite 862873 1 5m MagIQtouch Controller Cable No Ferrite 861265 3m MagIQtouch Controller Cable No Ferrite 864396 30m MagIQtouch Controller Cable With Ferrite 864402 40m MagIQtouch Controller Cable With Ferrite CONNECTING THE MAGIQTOUCH MAGIQCOOL CONTR...

Page 15: ...linity control to regular operation of the drain valve every 65 mins follow these programming steps To enter Parameter mode the following process must be carried out within 4 minutes of power being applied to the cooler If unsure of time since the last power ON remove power to the cooler Isolator Switch or Circuit Breaker for a minimum of 6 seconds so the mode can be entered 1 While wall control i...

Page 16: ...ir to fill with water The float valve will eventually stop the water from entering the cooler Wait for this to happen and check the water level If the level is too high rotate the float clockwise Drain some water from the tank and allow it to refill to the new set point If too low rotate the float in an anti clockwise direction For EXQ EXS model the correct water level is approximately 5mm above t...

Page 17: ...ump will run for 90 seconds before the fan is switched on Salinity Level Sets the salinity level at which the tank will drain in SALINITY MEASUREMENT mode Tank Drain Delay Sets the time delay before the drain valve opens after the pump in the cooler is turned off AutoClean Select the preferred cleaning interval 50 100 200 hours At 8 00am after the selected running hours has been reached the cooler...

Page 18: ...ing mode ensure all pads have even water saturation and there are no visible water leaks COOLER SECURE The cooler is secure and level on the dropper using all fixings supplied SEALED The dropper and all penetrations are correctly flashed and sealed WEATHERSEAL OPERATES The Weatherseal operates correctly and can open and close without interference PLUMBING FLUSHED The water pipes were flushed of an...

Page 19: ...estart the cooler MagIQtouch Controller failure Replace MagIQtouch Controller Pump runs but no water circulation Pump runs but pads lack water Insufficient water in tank Adjust float level Water hoses blocked Check and clean out blockage Pump strainer blocked Clean pump strainer Insufficient water supply pressure Check and confirm water supply pressure Water solenoid is installed incorrectly Check...

Page 20: ...NGHAM NG15 7HP UNITED KINGDOM SEELEY INTERNATIONAL AMERICAS LTD 1002 S 56TH AVENUE SUITE 101 PHOENIX ARIZONA 85043 USA SEELEY INTERNATIONAL AFRICA PTY LTD 6 WITTON ROAD FOUNDERSVIEW SOUTH MODDERFONTEIN 1609 GAUTENG SOUTH AFRICA EXQ EXS Cooler Installation Manuals Now provided on the internet available in English French German Italian and Spanish Refer www seeleyeurope com French Manuel d Installat...

Reviews: