SLIDE UNIT ON ITS LID
TO AVOID DAMAGE TO
CUTOFF PLATE
ILL939-A
UNPACKING THE COOLER
Cut and remove the shrink wrap from
around the cooler. Using 2 people,
carefully lift the cooler up and away
from it
’
s skid (Fig 1).
REMOVING PAD FRAMES
Firstly remove the corner clips, which
are located above the top louvre and
third louvre from the bottom on all
corner joins. The clips will require a
screw driver to aid removal.
Each frame is clipped into the cooler
and is removed by use of a medium
sized screwdriver. Insert the
screwdriver into the small slots at the
top of the frame and lever upwards until
the clips disengage. The frame is now
free to be lifted out of the cooler cabinet
(Fig.2).
1
2
Always locate the cooler where there is a
plentiful supply of clean fresh air, and not in
a recess or close to the ground where the air
may be dusty or polluted.
Keep the cooler
away from heater flues, exhaust vents
(especially kitchens) and sources of
ignition. Avoid dangerous situations.
Allow for adequate, SAFE access around the
cooler for maintenance, especially for pad
cleaning, water connections, electrical
connections, drain connections.
It is mandatory that water cannot enter the
building as a result of poor sealing (caulking
or flashing) of the various penetrations into
the building (ducts, necks, water pipes,
electrical conduits).
The cooler must be mounted at least 10ft
(preferably 15ft) away from the closest
element of any TV antenna. Make sure the
cooler is not between the antenna and the
transmission tower that is providing the
television signal to the home. Ensure that all
antenna cables are at least 10ft from the
cooler.
REPLACING PAD FRAMES
COOLER LOCATION
Ensure the pad frame is the correct
way up by checking that the louvres
face upwards. Fit the frame in at the
bottom along the edge of the pan and
rotate it in at the top. Take care not to
damage the Chillcel as the frame
approaches the plastic water spreader
under the top panel. Then two sharp
hits by hand should locate the frame
into its correct location under the top
panel. Replace the pad frame clips at
the corners
Check the proposed cooler location
first, to ensure it is structurally capable
of supporting the weight of the cooler.
Polymer coolers are light-weight but
they require adequate support. The
largest cooler in the EXV range is about
185 lbs (84 Kgs).
MOUNTING THE AIR COOLER.
Handling and installing the cooler is
always much easier if you remove the
pad frames first.
New installation, roof jacks
Replacement installation, roof jacks
Use 24 G or stronger metal roof jack. The
cooler may then be attached directly to the
jack.
Roof Jack recommended wall thickness
should be 24 G steel or stronger. The
supplied roof jack adaptor may be required
to attach the cooler to the existing roof jack.
For assembly of the roof jack adaptor, see
Fig. 4.
5
6
RAISING COOLER TO IT
’
S FINAL
LOCATION
! Take care when moving
the cooler that nothing is allowed
to penetrate into the discharge
opening (such as the end of a
ladder), as damage may occur to
the internal cooler components. If a
ladder is used as a slide for the
cooler to be pulled onto a roof or
platform, we strongly recommend
the cooler be turned upside-down
first. Protect the lid from
scratching.
HANDLE WITH CARE. DO NOT
DROP.
For lifting or pulling the cooler, always
apply the ropes around the full cabinet
or the fan housing and NEVER tie
them to any of the four corner posts.
After placing the cooler on the roof
jack check that water spreaders and
other internal components are all
securely in place.
WARNING
4
NOTE!
It is recommended that a strip
of foam or sealant is applied to the
upper flange on the roof jack before
securing the cooler to provide an
airtight seal.
Ensure that the top of the roof jack is
level, then check the lip of the pan for
level when the cooler is in position on
the roof jack. (Fig. 5)
3
SEELEY INTERNATIONAL –
INSTALLATION & OPERATION MANUAL
12
Installation Details