DOCS-001 Manual, SeaBotix Inc. Users, 150 – 200 Series - Rev B – 27 Jan 10 -
Page 15 of 64
Step 5
Remove the vacuum tube.
Step 6
Insert and tighten the Phillips pan head seal screw into the
check valve.
CAUTION: Do not over tighten the seal screw as it
could damage the sealing o’ring.
1.4.2
Powering up the system
1. Turn on the Integrated Control Console or the Surface Power Supply power
switch.
a. The red LED should illuminate.
b. After 2 seconds the amber status light should illuminate.
2. Press the POWER button on the operator control console.
a. The red LED above the POWER button should illuminate.
b. The amber LED on the Surface Power Supply should begin to strobe 2
seconds on/off.
c. The camera video should come up on the monitor with Video Overlay.
3. The 12 VDC & 5 VDC LED’s on the Motherboard should illuminate.
4. The Data In/Out LED’s on the Motherboard should flash at a 2 Hz (twice per
second) rate.
5. The Power LED (red) on the sensor board should illuminate.
6. The status LED (amber) on the sensor board should strobe 2 seconds on/off.
7. The power LED (red) on the Video Overlay board should illuminate.
1.4.3
Testing system
1.4.3.1
Thrusters
1. Push the joystick forward and backwards checking to see that both the
forward thrusters move and cycle through speed range.
2. Push the joystick left then right to ensure that the lateral thruster operates
correctly.
3. Rotate the joystick left then right to ensure that the forward thrusters operate
correctly.